BP Oil Reformer, Grangemouth

This industrial demolition project stands out for the company’s impressive innovation in creating a range of solutions to its many complex demands. Works were conducted 24 hours a day, seven days a week during BP’s shut down operations. Unique lifting cages for the removal of three catalytic reformers, weighing up to 310 tonnes each, were designed and fabricated by the engineering team of H Smith (Engineers). These were subsequently patented.

Asbestos removal was also required, followed by total demolition, as works were conducted 24 hours a day, seven days a week during BP’s shut down operations. A 1500 tonne mobile crane was vital to operations.

At a later stage H Smith (Engineers) Ltd dealt with the asbestos lining and cristobalite contaminated brickwork under controlled conditions prior to demolition of the remaining reformer shells.

Location:                    

BP Grangemouth

Client:                        

BP Oil

Project Value:           

Demolition:                £450,000  

Asbestos:                   £115,000    

Considerate Constructors National Site Awards 2014 - Bronze Award Winner

We are delighted to announce that following our recent nomination for a prestigious National Site Award we were successful in our endeavours picking up a Bronze award at the Ceremony held in London on 3rd April.

Full Story >

H Smith (Engineers) Wins another National Considerate Constructors Award

It is our pleasure to announce that we are yet again winners at The National Considerate Constructors Awards, this year to be held at Plaisterers' Hall on the 3rd April 2014.

Full Story >

Clients

Staff Login





Forget Your Password?